Loading...
Reference2019-08-08T15:50:13+01:00

Urban planning and Design technical documentation

  • Urban Projects for different locations in Serbia
  • Spatial plan for the Municipality of Kuršumlija, Serbia, 2014-2015
  • General Regulation Plans for the different settlements in Serbia (Požarevac, Malo Crniće, Kostolac), 2014-2015
  • Business building, Zlatibor, Serbia; Major Project and Urban Project, 2014-2015
  • Urban Project for Business building, Čajetina, Serbia, 2014-2015
  • Urban Project for Office building, Zlatibor, Serbia, 2013-2014
  • Urban Project for several Residential buildings, Kragujevac, Serbia, 2013-2014
  • Caffe and Restaurant, Zlatibor, Serbia; Renovation Project and Interior Design, 2013-2014
  • Loft Apartment, Podgorica, Montenegro; Renovation Project and Interior Design, 2013-2014
  • Urban plan-General Regulation Plan for the Municipality of Čajetina, Serbia, 2012-2013
  • Urban plan-General Regulation Plan for the Municipality of Čajetina, Serbia, 2012-2013
  • Urban plan-Spatial plan for the Municipality of Bojnik, Serbia, 2011-2012
  • Detailed regulation plan for Zlatibor, Serbia, 2011-2012
  • Business space in Podgorica, Montenegro; Renovation Project and Interior Design, 2011-2012
  • Spatial plan for the Municipality of Kosjerić, Serbia, 2010-2011
  • Detailed regulation plans for different settlements in Serbia (Kupinovo, Rendara), 2009-2010
  • Urban plan – Plan of general arrangement of Divljakovac and Veliko Brdo, Despotovac, 2008
  • Urban plan – PGR for settlement Banjska, 2007
  • Master plans for the municipalities of Kladovo and Prijepolje, 2004
  • Urban plan – Urbanistic and architectural arrangement of the central pedestrian zone of Belgrade – spatial units of Knez Mihailova Street, 2007
  • Urban planning and architectural arrangement of the square and pedestrian zone in Zaječar, 2006
  • Conceptual and execution projects of pedestrian streets in the Knez Mihailova zone (16 streets),
  • Projects for rehabilitation and presentation of all objects and ports of the Kalenić monastery,
  • Urban plan – Master plan of city of Beograd, 2001

Water and wastewater infrastructure urban planning documentation

  • Master plan for Beograd city water supply infrastructure
  • Master plan for Beograd city wastewater collection and WWTP infrastructure
  • Master plan for Beograd city river regulation and flood protection infrastructure
  • Detailed Urban plan for reconstruction of water treatment plant Bezanija, 2003
  • Urban plan for regional water supply system construction Zucka kapija-Kaludjerica, 2003
  • Detailed Urban plan for sewerage pumping station KCS “Zeleznik”, 2003

Design, Design review and Supervision for water and wastewater infrastructure

  • Design with Feasibility study for Reconstruction 3 main streets in Smederevo, 2005
  • Design with Feasibility study for Upgrading IIndand IIIrd water supply height zone, 2005
  • Design with Reservoir “Zlatno brdo” and water supply net, 2005
  • Design for Establishing Moravski water supply system with additional water source in Smederevo municipality
  • Design with Feasibility study for Smederevo Industrial zone environment protection by equipping with sewerage collection system (20km network) and WWTP (WasteWater Treatment Plant) with other necessary communal infrastructure, 2005
  • Design with Feasibility study for Waste water sewerage, drainage system with WWTP plant for Krnjaca settlement, 3500PE, 2004
  • Design with Feasibility Study for Waste water sewerage and drainage system for Kacarevo settlement;
  • Design with Feasibility Study and Procurement for Waste water sewerage and drainage system for Orasje settlement, BiH, 2004
  • Supervision and Contract/Procurement expertise and External Tender Evaluation for Berovo and Kumanovo Sewerage construction tender, Coordination with PIU, 2015-2016
  • Master Planning Process of River Basin Management Documentation titled “Preparation of a Sewerage & Wastewater Strategic Master Plan for Southern Morava Region and Tender Documents for the Construction of a Model WWTP with Capacity 5000PE , 2004
  • Design review and Supervision of construction works for Telavi WWTP  (91000PE-18760m3/day), Georgia,  2016-2018
  • Design review and Supervision of construction works for Tskaltubo WWTP  (25500PE-6477m3/day, Georgia,  2016-2018
  • Design review and Supervision for the construction of 80km of WW collection networks in 5 settlements in Republic Srpska (Prijedor Tukovi-3mil €, Gradiska 3mil €, Novi grad-4mil €, Kotor varos-3mil €, Teslic-2mil €), 17mil € in total, 2013-2015
  • Design review and Supervision for Nevesinje WWTP reconstruction, 10000PE, 2013-2015
  • Design review and Supervision construction works and review of tender documents of Conceptual design for WWTP in Teslic settlement.15000PE Design review for WWTP in Kozarac and Omarska settlements. Sludge management., 2013-2015
  • Design review and Supervisionconstruction works according to FIDIC for Prijedor Tukovi  project for 56km of sewerage network  2013-2015
  • Supervision of Sewerage CCTV surveying according to PRAG and FIDIC Red and Yellow book procedures for Kraljevo (primary and secondary treatment), PE 320.000, sewerage network L=150km; Brus town (primary, secondary and tertiary treatment), PE 11.000, L=30km; Blace town (primary, secondary and tertiary treatment) 15.000PE, L=35km; Sludge management, .2012-2013
  • Design review and Supervision construction works  for 2U Project – Reconstruction of the industrial WWTP in Mine and Thermal Power Plant Ugljevik. Follow up and check of Technical documentation, Bill of Quantities and bidding documents for supply and installation of the plant and equipment. Supervising the project per World Bank guidelines and Procurement procedure under EBRD loans and IDA credits, FIDIC Red and Yellow book procedures. Supervision of compliance with technical requirements and standards. Procurement services. Supervision of reconstruction of WW collection system and WWTP (prim & sec treatment) in Ugljevik coal mine (PE 1,500, L = 25 km). Fin by: EBRD & IDA.  Project Value 18 mil €., 2010-2012
  • Supervision of Reconstruction of the Waste Water Treatment System in Thermal Power Plant Gacko. Follow up of Technical documentation, BoQ and bidding documents for supply and installation of the plant and equipment. Supervision of compliance with technical requirements and standards. Procurement services. Supervision of reconstruction of WW collection system and WWTP in Mine and Thermal Power Plant Gacko. Sludge management. Construction of sewerage network of 30 km acc to FIDIC Red and Yellow book. Fin by: EBRD & IDA , Project Value 22 m €.., 2010-2012
  • Kostajnica Water Supply and Wastewater network, Atmospheric Wastewater Drainage Infrastructure Project. Evaluation and Supervising and FIDIC Consulting services (“Red book”) for construction works. Construction Supervision of 20km of sewerage network, pumping station, 12km of Water Supply networks, Drainage works,  Procurement of equipment and materials, Sludge management. Procurement, Quality and quantity estimations of works. Financed by KfW. Project Value 6.5 mil €., 2009-2010
  • Feasibility study and project documentation for rehabilitation and development of navigation and transport on the Sava river waterway. Project Value: 4mil €. Financed by: EU, 2007-2012
  • Monitoring, standardization of sustainable public procurement appropriateness in water sector of Serbia. Benchmarking of water operators.  Collection and analysis of performance indicators of utility companies for the period 2005 – 2012 – technical and institutional consultancy (World Bank), 2005-2012.
  • Preparation and Implementation of the Sava River Basin Management Plan. Project Value: 5mil €. Financed by: EU. 2007-2012
  • Pre-Feasibility Study for the New International Port of Sabac. Urban planning, Environment protection assessment, 2007-2012
  • Evaluation and Analysis Study of Waste Water Sanitation System in Serbia. Presentation of current existing technologies for waste water treatment and working WWTP facilities in Republic of Serbia. Financed by: GIZ, 2010-2011
  • Technical support expert for coordination with Municipal water company. Contract / Procurement Management for Evaluation of existing technical documentation and on-site conditions. Master Plan for Pre-feasibility study and Design of Waste Water treatment Plant (WWTP) for Obrenovac city – 55,000 PE.. Iinfrastructure Development. of Water and sanitation environment infrastructure within wider city area, 2008-2009
  • Development of Design Documentations for sewerage network and WWTP for Brzece (4000PE with primary mechanical and secondary biological treatment), sewerage network and WWTP Rumenka (14,000 PE with primary mechanical and secondary biological treatment), sewerage network and WWTP Kanjiza (11,000 PE), sewerage network and WWTP Kac  and Budisava (20,000 PE), WWTP Mali Idjos (20,000PE with primary mechanical and secondary biological treatment), WWTP Temerin (36,000PE with primary mechanical and secondary biological treatment), Industrial and communal WWTP Kula Vrbas (180,000 PE), 2007-2012
  • Planning activities and Contract Supervising Management, Procurement and Design Review, Evaluation of existing technical documentation and on-site conditions. Master Planning Process of River Basin Management Documentation titled “Preparation of a Sewerage & Wastewater Strategic Master Plan for Southern Morava Region and Tender Documents for the Construction of a Model WWTP with Capacity 5000PE”. Supervision of planning process activities regarding establishment and fulfilment of beneficiary’s project tasks, WFD (Water Framework Directive) Law on waters requirements. Coordination of necessary changes in River Basin Planning Development of feasibility studies for conceptual design for 250km of sewer networks, 2006-2009
  • Planning and Design Review, Evaluation of existing technical documentation and on-site conditions. Infrastructure Investment Project Water resource and sanitation environment infrastructure development.. Planning Services for Reconstruction of Airport WW Infrastructure Network and Sewerage Pump Station acc. to FIDIC Red book. Review of planning documents. Infrastructure synchron planning, urban planning of hydrotechnic infrastructure, 2001-2006

Design technical documentation for road infrastructure

  • Sports Center in Ufa, Russia with all facilities. Design of roads, parking platforms, manipulation areas
  • Design technical documentation for roads transport infrastructure development within city central zone area of Beograd, 2006
  • Master plans for various Municipality Councils in Belgrade – traffic and transportation infrastructure for urban plans, included local and regional railways, 2004
  • Construction of Mirgab Approach Motorways, included local and regional railways. Technical assistance support to state railways institution, 2004
  • Construction – rehabilitation of the airport platforms, airport “Nikola Tesla” , 2004
  • Planning of Beograd subway project, Technical assistance support to state Railways institution, 2002
  • Kladovo Master Plan, City Land Development Public Agency, 2004 and 2005
  • Prijepolje Master Plan, City Land Development Public Agency, 2004, 2005
  • Master Construction Design of Street Rehabilitation with Urban mobiliard Belgrade: Jovanova, Jevremova, Kosovska, Kondina Belgrade Road Directorate, Implementation Year: 2004