Loading...
Референце2018-12-20T17:27:56+01:00

РЕФЕРЕНЦЕ

Urban planning and Design technical documentation

  • Urban Projects for different locations in Serbia
  • Spatial plan for the Municipality of Kuršumlija, Serbia, 2014-2015
  • General Regulation Plans for the different settlements in Serbia (Požarevac, Malo Crniće, Kostolac), 2014-2015
  • Business building, Zlatibor, Serbia; Major Project and Urban Project, 2014-2015
  • Urban Project for Business building, Čajetina, Serbia, 2014-2015
  • Urban Project for Office building, Zlatibor, Serbia, 2013-2014
  • Urban Project for several Residential buildings, Kragujevac, Serbia, 2013-2014
  • Caffe and Restaurant, Zlatibor, Serbia; Renovation Project and Interior Design, 2013-2014
  • Loft Apartment, Podgorica, Montenegro; Renovation Project and Interior Design, 2013-2014
  • Urban plan-General Regulation Plan for the Municipality of Čajetina, Serbia, 2012-2013
  • Urban plan-General Regulation Plan for the Municipality of Čajetina, Serbia, 2012-2013
  • Urban plan-Spatial plan for the Municipality of Bojnik, Serbia, 2011-2012
  • Detailed regulation plan for Zlatibor, Serbia, 2011-2012
  • Business space in Podgorica, Montenegro; Renovation Project and Interior Design, 2011-2012
  • Spatial plan for the Municipality of Kosjerić, Serbia, 2010-2011
  • Detailed regulation plans for different settlements in Serbia (Kupinovo, Rendara), 2009-2010
  • Urban plan – Plan of general arrangement of Divljakovac and Veliko Brdo, Despotovac, 2008
  • Urban plan – PGR for settlement Banjska, 2007
  • Master plans for the municipalities of Kladovo and Prijepolje, 2004
  • Urban plan – Urbanistic and architectural arrangement of the central pedestrian zone of Belgrade – spatial units of Knez Mihailova Street, 2007
  • Urban planning and architectural arrangement of the square and pedestrian zone in Zaječar, 2006
  • Conceptual and execution projects of pedestrian streets in the Knez Mihailova zone (16 streets),
  • Projects for rehabilitation and presentation of all objects and ports of the Kalenić monastery,
  • Urban plan – Master plan of city of Beograd, 2001

Water and wastewater infrastructure urban planning documentation

  • Master plan for Beograd city water supply infrastructure
  • Master plan for Beograd city wastewater collection and WWTP infrastructure
  • Master plan for Beograd city river regulation and flood protection infrastructure
  • Detailed Urban plan for reconstruction of water treatment plant Bezanija, 2003
  • Urban plan for regional water supply system construction Zucka kapija-Kaludjerica, 2003
  • Detailed Urban plan for sewerage pumping station KCS “Zeleznik”, 2003

Design, Design review and Supervision for water and wastewater infrastructure

  • Design with Feasibility study for Reconstruction 3 main streets in Smederevo, 2005
  • Design with Feasibility study for Upgrading IInd and IIIrd water supply height zone, 2005
  • Design with Reservoir “Zlatno brdo” and water supply net, 2005
  • Design for Establishing Moravski water supply system with additional water source in Smederevo municipality
  • Design with Feasibility study for Smederevo Industrial zone environment protection by equipping with sewerage collection system (20km network) and WWTP (WasteWater Treatment Plant) with other necessary communal infrastructure, 2005
  • Design with Feasibility study for Waste water sewerage, drainage system with WWTP plant for Krnjaca settlement, 3500PE, 2004
  • Design with Feasibility Study for Waste water sewerage and drainage system for Kacarevo settlement;
  • Design with Feasibility Study and Procurement for Waste water sewerage and drainage system for Orasje settlement, BiH, 2004
  • Master Planning Process of River Basin Management Documentation titled “Preparation of a Sewerage & Wastewater Strategic Master Plan for Southern Morava Region and Tender Documents for the Construction of a Model WWTP with Capacity 5000PE , 2004

Design technical documentation for road infrastructure

  • Sports Center in Ufa, Russia with all facilities. Design of roads, parking platforms, manipulation areas
  • Design technical documentation for roads transport infrastructure development within city central zone area of Beograd, 2006
  • Master plans for various Municipality Councils in Belgrade – traffic and transportation infrastructure for urban plans, included local and regional railways, 2004
  • Construction of Mirgab Approach Motorways, included local and regional railways. Technical assistance support to state railways institution, 2004
  • Construction – rehabilitation of the airport platforms, airport “Nikola Tesla” , 2004
  • Planning of Beograd subway project, Technical assistance support to state Railways institution, 2002
  • Kladovo Master Plan, City Land Development Public Agency, 2004 and 2005
  • Prijepolje Master Plan, City Land Development Public Agency, 2004, 2005
  • Master Construction Design of Street Rehabilitation with Urban mobiliard Belgrade: Jovanova, Jevremova, Kosovska, Kondina Belgrade Road Directorate, Implementation Year: 2004
  • SWMP – Sustainable Wastewater Management Project for supervision of construction two WWTP’s in Telavi (91000PE) and Tskaltubo (25500PE) settlements, Georgia. Planning Review, Supervision and Contract/Claims Management for Design&Build project, Design review and Supervision of 2 activated sludge, trickling filters WWTP and sewerage networks Claims assesment management, 2016-2018
  • Supervision and Contract/Procurement expertise and External Tender Evaluation for Berovo and Kumanovo Sewerage construction tender, Coordination with PIU, 2015-2016
  • Design review and Supervision for 11 settlements in Republic Srpska, BiH, consisting of water supply and waste water collection and wastewater treatment projects, in following settlements: Prijedor, Kozarac, Ribnik, Krupa na Uni, Novi Grad, Kotor varos, Kozarska dubica, Gradiska, Laktasi, Teslic. Sipovo. Project encompassed Coordination with PIU i.e. Contract/Claims Management and Procurement activities, Technical Assistance and institutional strengthening activities, Review, Supervising& Claims assesment&procurement, Contract management of water and waste water infrastructure works and planning documentation, Supervision of 50km of wastewater-WW pipelines collection system.construction and rehabilitation, 3 activated sludge WWTP Design review and Implementation FIDIC “Red and yellow book” principles. 2013-2015
  • Technical support expertise for sustainable development of Municipal infrastructure. Supervision and Contract/Claims Management and Procurement for PPF4-Project Preparation Facility 4. Technical support for municipalities in planning for waste water infrastructure, environment protection and waste water treatment plants for 3 settlements in Serbia. Evaluation of Infrastructure Investment. Performing: Feasibility studies for 3 settlements, Preparing ToR for Surveying and CCTV of Sewerage; Procurement Services. EIA-Environment Impact Assesment study performing. Supervision of Sewerage CCTV survey for Kraljevo city (primary mechanical and secondary biological treatment), 160.000PE first phase, 50km of sewer for rehabilitation, (planned PE320.000); WWTP for Brus town PE 11000, 30km of sewer; WWTP for Blace town (primary mechanical, secondary biological and tertiary treatment, 15.000PE), Supervision rehabilitation and construction 35km of sewerage; Project value 56 mil€. EBRD procurement procedures. EU WFD-Water Framework Directive implementation and RBM-River Basin Management plans implementation.2012-2013
  • Monitoring, standardization of sustainable public procurement appropriateness in water sector of Serbia. Benchmarking of water operators.  Collection and analysis of performance indicators of utility companies for the period 2005 – 2012 – technical and institutional consultancy (World Bank), 2005-2012
  • Supervision of activated sludge WWTP. 2U Project – Reconstruction of the industrial WWTP in Mine and Thermal Power Plant Ugljevik.
  • Supervising& Claims assesment&procurement, Contract management of water and waste water infrastructure works and planning documentation. Water supply and sanitation environment protection infrastructure development. Energy transmission infrastructure development. Supervising the project per World Bank guidelines and Procurement procedure under EBRD loans and IDA credits, FIDIC Red and Yellow book procedures. Supervision of compliance with technical requirements and standards. Procurement services. Supervision of reconstruction of 6km of WW corrugated pipelines collection system and Ugljevik WWTP, PE 4500), Supervision of rehabilitation and construction 25km of sewerage, 2010-2012
  • Supervision of activated sludge WWTP. Contract management of Infrastructure Investment Project for Waste Water Treatment System in Thermal Power Plant Gacko supervision with quantitive and qualitative data collection and analysis within evaluation Methods and techniques used. Implementation of IFI financed projects and blending instruments. Roads and railways transport infrastructure development. The development of water and sanitation environment protection infrastructure. Energy transmission development upgrade. Supervision of reconstruction of Gacko WWTP for 6000PE with primary mechanical and secondary biological treatment and rehabilitation of 20km of corrugated pipelines sewerage, with FIDIC Red book, 2010-2012
  • Feasibility study and project documentation for rehabilitation and development of navigation and transport on the Sava river waterway. Project Value: 4mil €. Financed by: EU.
  • Preparation and Implementation of the Sava River Basin Management Plan. Project Value: 5mil €. Financed by: EU.
  • Pre-Feasibility Study for the New International Port of Sabac. Urban planning, Environment protection assessment, 2007-2012
  • Evaluation and Analysis Study of Waste Water Sanitation System in Serbia. Presentation of current existing technologies for waste water treatment and working WWTP facilities in Republic of Serbia. Financed by: GIZ, 2010-2011
  • Technical support expert for coordination with Municipal water company. Contract / Procurement Management for Evaluation of existing technical documentation and on-site conditions. Master Plan for Pre-feasibility study and Design of Waste Water Treatment Plant (WWTP) for Obrenovac city – 55,000 PE.. Iinfrastructure Development. of Water and sanitation environment infrastructure within wider city area, 2008-2009
  • Development of Design Documentations for sewerage network and WWTP for Brzece (4000PE with primary mechanical and secondary biological treatment), sewerage network and WWTP Rumenka (14,000 PE with primary mechanical and secondary biological treatment), sewerage network and WWTP Kanjiza (11,000 PE), sewerage network and WWTP Kac  and Budisava (20,000 PE), WWTP Mali Idjos (20,000PE with primary mechanical and secondary biological treatment), WWTP Temerin (36,000PE with primary mechanical and secondary biological treatment), Industrial and communal WWTP Kula Vrbas (180,000 PE), 2007-2012
  • Planning activities and Contract Supervising Management, Procurement and Design Review, Evaluation of existing technical documentation and on-site conditions. Master Planning Process of River Basin Management Documentation titled “Preparation of a Sewerage & Wastewater Strategic Master Plan for Southern Morava Region and Tender Documents for the Construction of a Model WWTP with Capacity 5000PE”. Supervision of planning process activities regarding establishment and fulfilment of beneficiary’s project tasks, WFD (Water Framework Directive) Law on waters requirements. Coordination of necessary changes in River Basin Planning Development of feasibility studies for conceptual design for 250km of sewer networks, 2006-2009
  • Planning and Design Review, Evaluation of existing technical documentation and on-site conditions. Infrastructure Investment Project Water resource and sanitation environment infrastructure development.. Planning Services for Reconstruction of Airport WW Infrastructure Network and Sewerage Pump Station acc. to FIDIC Red book. Review of planning documents. Infrastructure synchron planning, urban planning of hydrotechnic infrastructure, 2001-2006